Published: September 13, 2024 @ 9:30 a.m.
The Town of Grand Bay-Westfield remains committed to its strategic priority of infrastructure sand climate adaptation.
The annual sanitary sewer main flushing program is scheduled to begin on September 16, 2024.
About the Sewer Main Flushing Program
High-pressure flushing equipment is used to clean the sewer line with high-pressure water. The debris is then vacuumed from the manhole with a high-powered vacuum hose. This annual program performs proactive maintenance for the prevention of sewer back-ups across the entire municipal sewer system.
Frequently Asked Questions
For more information on the sewer main flushing program, visit HERE.
Town Contact Information
Phone: (506) 738-6400
Email: administration@towngbw.ca
In-person: 609 River Valley Drive, Monday to Friday from 8:30 a.m. until 4:30 p.m. (excluding holidays)
Register for Grand Bay-Westfield Emergency Alerts
The Town of Grand Bay-Westfield encourages residents to register for the emergency alert system (CodeRED by OnSolve). This is to ensure that the Town can notify residents in the event of emergency situations or critical community alerts. To register, visit HERE.
Stay Informed
Follow the Town of Grand Bay-Westfield on Facebook and X (formerly Twitter) or visit www.grandbaywestfield.ca